Aurora A27 · Compass
o9 Capability Mapping Blueprint
✦ A Compass for the Programme

Aurora A27 — o9 Capability Mapping Blueprint

Silver → Platinum-Plated Transition | Out-of-the-Box vs. Extension scoring against the o9 Digital Brain (HERO programme)

This blueprint maps the 12 Aurora A27 requirements (Requirements Spec. Register v1.2, owner: Aurora GOPT / Jan Karreby) against Pandora's existing planning system landscape, with depth on the o9 Digital Brain. Each requirement is scored on how much is delivered natively (out-of-the-box) versus how much requires configuration, modelling, or build extensions — and where the work lands across the wider landscape (Logility, Aptean, IPPL/IPPL-120, AX12 MANU, D&A, Merch/O2C).

Scoring Scale · OOTB Fit
90–100%
Native OOTB
Standard o9 capability; configuration only.
70–89%
Mostly OOTB
Core capability native; light modelling/config.
50–69%
OOTB + Extension
Strong base; meaningful config/custom logic or measures.
30–49%
Significant Extension
Native frame, but core logic must be built (rules/integration).
0–29%
External / Integration
Largely owned outside o9 or new integration build.
✦ Constellation

The Pandora planning landscape

Seven systems surround the o9 Digital Brain. Each has a specific role in how Aurora moves from Silver to Platinum-Plated.

o9DIGITAL BRAINLogility(Aptean)ApteanReplenIPPL120AX12MANUD&AAnalyticsMerch/ O2C
Planning System

o9 Digital Brain

Core IBP / demand + supply planning engine for o9 markets. Enterprise Knowledge Graph (EKG) digital twin. Primary mapping target.

✦ Hero Visualization

The OOTB compass

Twelve spokes, twelve requirements. Spoke length is the share o9 delivers natively; outer arc colour signals the GOPT impact. Click any spoke to dive in below.

REQ-0185%REQ-0280%REQ-0345%REQ-0475%REQ-0560%REQ-0670%REQ-0778%REQ-0835%REQ-0972%REQ-1025%REQ-1155%REQ-1258%62%PORTFOLIO OOTBAURORA A27 · 12 REQUIREMENTSSPOKE LENGTH = OOTB FIT · OUTER ARC = GOPT IMPACT
Strongest fit
REQ-01 · 85%

Native data model; the only true build is Aurora-specific DQ gating + the Silver↔PP link governance.

Lowest fit
REQ-10 · 25%

Lowest OOTB fit — o9 consumes natively, but the requirement is fundamentally an external dependency + integration on AX12 MANU.

Portfolio verdict
62% average OOTB

o9 covers the planning spine natively; extensions concentrate on Aurora transition mechanics, retail-grain disaggregation, compliance workflow, and the AX12 integration.

✦ All twelve, in detail

Requirements heatmap

Filter by band or GOPT impact. Click a card to open the full capability mapping on the right.

REQ-01 · Primary: o9 (master) + AX12/PIM upstream

Master Data, Variants & Assortments

Mostly OOTB · 85% OOTBGOPT · Both
Capability Compositionweighted by detail depth
Out-of-the-Box · 31%Configuration · 25%Extension / Build · 23%External / Integration · 21%
Out-of-the-Box

o9 EKG natively models product master, planning attributes, hierarchies and assortments as a digital twin. Variant relationships and attribute-based product structures are first-class. Predecessor–successor (Silver→PP) linkage is a standard lifecycle construct.

Configuration

Configure A27 PP DV attribute set, hierarchy/assortment nodes, and the Silver↔PP link relationship; default-inheritance-from-Silver rule via attribute defaulting; route/BOM planning attributes for hybrid flow.

Extension / Build

Custom validation measures to enforce 'unique ID + valid planning attributes' and 'mandatory Silver↔PP link on Base Transition DVs' as gating data-quality rules with reject reporting (AC3).

External / Integration

Authoritative product/BOM master originates upstream (PIM / AX12); o9 consumes via integration. Load-success confirmation handshakes to downstream systems (Logility, Aptean, IPPL).

Verdict

Native data model; the only true build is Aurora-specific DQ gating + the Silver↔PP link governance.

Deliberately distributed
REQ-03 · Transition Rule Management

The substitution engine exists; the Aurora cutover rule-set is bespoke and ownership is deliberately distributed off GOPT.

External-heavy
REQ-10 · Hybrid Manufacturing Planning

Lowest OOTB fit — o9 consumes natively, but the requirement is fundamentally an external dependency + integration on AX12 MANU.

Workflow-heavy
REQ-08 · Composition & Compliance

Attributes fit o9 but compliance sign-off & COO route logic are workflow-heavy and largely external — low OOTB.

Where the build lands
18 extension items

Concentrated on Aurora transition mechanics, retail-grain disaggregation, compliance workflow, and the AX12 integration.

✦ Where build / integration is required

Extension backlog

Beyond o9 OOTB: every item that must be built, configured, or integrated. Grouped by priority, tagged by owning system and type.

Critical
1
REQ-10Integration

AX12 MANU → o9 integration

Ingest allocation proportions + step lead times; PP setup confirmation; one-cycle change propagation; consistency check

Owner · AX12 MANU → o9 / IPPL-120
High
10
REQ-03Build+Config

Hard/Soft cutover rule engine

Cutover-type config, soft-cutover transfer profiles, override matrix + audit, post-cutover Silver thresholds

Owner · o9 (consumes); Merch/IPPL/Aptean own scope
REQ-03External

Silver disposition / markdown

Disposal/markdown rule for outgoing Silver stock

Owner · Merch / O2C
REQ-05Build

SKU×Store disaggregation

Retail-grain disaggregation with reconciliation; new build below core planning grain

Owner · o9
REQ-05Integration

Aptean replenishment feed

Versioned SKU×Store handoff consumable by Aptean; cadence contract

Owner · o9 → Aptean
REQ-05Build

Wave-2 NPI auto-disaggregation

Scalable automated NPI method to replace Year-1 manual workaround before 2027 (330+ DVs)

Owner · o9
REQ-06Config+Build

Plating finite-capacity model

Weekly finite plating capacity, wave-allocation & capacity-sharing rules, utilisation alerts

Owner · o9 / IPPL-120
REQ-08External+Build

Compliance sign-off workflow

Per-market sign-off gating prior to ship/readiness; COO route logic for hybrid route

Owner · PLM/Compliance + o9 status
REQ-11Build

Silver/PP coexistence alerting

Run-down/build-up deviation alert engine; Silver-vs-PP split views linkable

Owner · o9
REQ-11Integration

CM & in-transit traceability feeds

WIP at platers + in-transit + store-level visibility feeds

Owner · Execution/ERP → o9
REQ-12Build

Unified transition scorecard

Cross-market KPI calc rules, RAG/exception, weekly cadence reconciling demand↔supply/inventory

Owner · o9 IBP
Med
7
REQ-01Build

DQ gating & Silver↔PP link governance

Validation measures enforcing unique ID, valid attributes, mandatory link on Base Transition DVs; reject reporting

Owner · o9
REQ-02Build

Sell-in pack lifecycle logic

Pack-aware phase-in/out (volume, timing, pack composition) for initial Aurora launches

Owner · o9
REQ-04Build

Price-elasticity & pack forecast

Elasticity effect at differing Silver/PP price points + sell-in pack forecast logic

Owner · o9
REQ-07Config

Time-phased insourcing sourcing

Source-mix evolution toward fully insourced model over horizon

Owner · o9 / IPPL-120
REQ-09Integration

Cross-system node-ID MDM

Consistent node IDs across o9 / Logility / IPPL for plater nodes & route legs

Owner · MDM / Integration
REQ-12Build

Value-based KPI views

Revenue / margin-impact views alongside volume KPIs

Owner · o9 IBP / D&A
REQ-12Integration

Non-o9 markets via Logility

Integrate Logility outputs + surface through D&A semantic layer

Owner · Logility / D&A
✦ Where build lands in time

Extension delivery roadmap

Eighteen extension items, three phases, four parallel squads, ten 2-week sprints. Critical path runs through AX12 MANU (REQ-10) and PLM compliance sign-off (REQ-08).

P0 · Foundation
Jul–Sep 2026

MVP Foundation

Data spine + critical integration

Items
4
Story pts
53
Elapsed
~5 sprints / 10 wks
Exit gate

AX12→o9 feed live; master data & node IDs stable; DQ gating passing.

P1 · Transition
Sep–Dec 2026

MVP Transition

Go-live transition mechanics

Items
7
Story pts
76
Elapsed
~5 sprints / 10 wks
Exit gate

Cutover rules, SKU×Store + Aptean feed, capacity model, compliance gating validated for H2-26 launch.

P2 · Follow-on
Jan–Jun 2027

Follow-on Scale

Scorecard, value, Wave-2 scale

Items
7
Story pts
81
Elapsed
~5 sprints / 10 wks
Exit gate

Transition scorecard + value KPIs live; Wave-2 NPI automation ready before 330+ DV wave.

Total18items
210story points
~15 sprints / ~12 months elapsed with parallel squads (vs 48 sprints if serial)
Q3 2026
Q4 2026
Q1 2027
Q2 2027
H2 2027
Squad / Item
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
Data & Integration5
Demand6
Supply3
Reporting4
Gates
G0
G1
G2
Parallel work

Squad load by sprint

Items in flight · max 3
Data & Integration
2
3
2
1
1
1
1
1
1
1
Demand
2
3
3
2
1
2
Supply
1
2
2
1
1
1
Reporting
1
1
1
3
★ Critical path

AX12 MANU→o9 integration (REQ-10, 5 sprints) and PLM compliance sign-off (REQ-08, 4 sprints) are the longest, externally-dependent items. Start both at sprint 1 / earliest; slippage here moves go-live.

Assumptions

Parallel squads (Data & Integration, Demand, Supply, Reporting); external partners (AX12/Pl2Pr, PLM, Aptean, Logility) resourced to agreed cadence; o9 reference-model alignment maintained to limit custom build.

end P0, ~Sep 2026
Gate G0

Go/No-Go for transition build: AX12 feed flowing, master data + node IDs stable, DQ gating green. Blocks P1 if not met.

end P1, ~Dec 2026
Gate G1

Go-live readiness for H2-2026 launch: cutover rules, SKU×Store + Aptean feed, plating capacity, compliance gating all UAT-signed.

end P2, ~Jun 2027
Gate G2

Wave-2 scale readiness: scorecard + value KPIs live, NPI auto-disaggregation proven before the 330+ DV 2027 wave.

P0 · FoundationP1 · TransitionP2 · Follow-on★ Critical path1 sprint = 2 weeks · click any bar to open the requirement
✦ Cross-system ownership

Requirement ↔ system dependencies

Each requirement traced to the systems that must deliver against it. Hover to isolate a thread.

REQ-01Master Data, Variants & Assort…REQ-02Lifecycle & Transition PlanningREQ-03Transition Rule ManagementREQ-04Transition & NPI ForecastingREQ-05Forecast Transfer & Disaggrega…REQ-06Capacity Constraint PlanningREQ-07Multi-Source Supply PlanningREQ-08Composition & ComplianceREQ-09Dynamic Supply Network Managem…REQ-10Hybrid Manufacturing PlanningREQ-11Inventory Visibility & Traceab…REQ-12Planning Data Integration & Re…o9IPPL-120AX12 MANUApteanLogilityMerch / O2CD&APLM / MDMExecutionREQUIREMENTSOWNING SYSTEMS

Hover a requirement or system to isolate its dependencies. Derived from primary + extension owner mappings.